Krischan Gardens Bed T26:
Construction of the bed.

20 September 2001. Digging up the lawn. Notice the old cedar siding on house, christmas lights hanging on gutter, and split rail fence.

20 September 2001. Two dozen bags of top soil and compost wait to be added. This bed becomes a major annual garden.


Krischan Gardens Bed T26:
Construction of the bed.

20 September 2001. Notice the light gren section behind the garden work. This was sprayed with RoundUp and will eventually become more gardens.

20 September 2001. Stepping stones are placed to divide this garden from the pond area.

22 September 2001. Truck delivery of mulch. Once spread, the garden will be ready for planting in 2002.


Home back to the home page